Syria’s Renewable Energy Master Plan: What the Numbers Say

A data-driven analysis of Syria’s renewable energy plan to 2040: the conditional 61.4% demand share, solar capacity, grid, storage and finance.

Energy Analysis & Policy
Text size

On 23 November 2026, Syria’s Ministry of Energy launched its Renewable Energy Master Plan in Damascus in partnership with Norway and the United Nations Development Programme (UNDP). It positions solar and wind expansion within the reconstruction of the power system, rather than treating generation independently of fuel, networks and storage. Its headline finding is not guaranteed new capacity: solar and wind could conditionally meet 61.4% of electricity demand by 2040.

The headline numbers

More than 57.4 GW of solar and wind potential; a 61.4% demand share in the 2040 scenario; more than 4,000 km of new transmission lines, restoration of 812 km and seven new substations at an estimated USD 1.5 billion. IRENA records 3,806 MW of installed renewable capacity at end-2025, including 2,060 MW of off-grid solar.

These figures describe different categories: resource potential, modelled energy shares, planned investment and historical installed capacity. None should be confused with operating capacity or binding targets. The complete technical plan was not available for review when this article was prepared.

Explore the Master Plan to 2040

Eight interactive views: demand, grid, solar, capacity mix, projects, finance, timeline and scenarios.

Source: UNDP · IRENA · Syrian Renewables

1. From the framework agreement to launch

The launch occurred approximately 18 months after the Norway–UNDP framework agreement, compared with the originally announced 12-month preparation period. This difference alone does not establish the causes of the delay.

  • 18 May 2025 — National Electricity Master Plan launched with UNDP support, according to the supplied analysis; it provides the umbrella for integration with the renewables plan.
  • 22 May 2025 — Norway and UNDP signed the framework agreement for the Renewable Energy Master Plan.
  • 29 May 2025 — UCC-led consortium memorandum of understanding, including 1,000 MW solar within a broader generation package.
  • September 2025 — ACWA Power joint development agreement announced to study around 2.5 GW of solar and wind; reporting dates include 4 September.
  • 6 November 2025 — Final concessions signed for the UCC 5,000 MW package, including 1,000 MW solar.
  • 5 August 2026 — Al Harfi agreements: 760 MW solar and 1,077 MWh storage.
  • 22 October 2026 — Syrian participation in IRENA’s 32nd Council meeting, per the supplied analysis.
  • 23 November 2026 — Launch in Damascus, including a Ministry–MRC presentation; SANA reported the event on 24 November.

2. The 2040 horizon: substantial potential, conditional outcomes

UNDP identifies more than 57.4 GW of solar and wind potential and a possible 61.4% electricity demand share by 2040, with demand projected to nearly triple and fuel requirements potentially declining by around a quarter between 2035 and 2040. The English headline broadly refers to half of demand; the body specifies 61.4%. We retain the precise figure and its scenario status. The release does not define whether potential is theoretical, technical or economic, or provide annual technology-specific MW targets.

What does the share imply for annual electricity?

Applying 61.4% to an illustrative 2040 demand range of 100–125 TWh/year yields 61.4–76.75 TWh/year of solar and wind electricity (approximately 61–77). This is a sensitivity range from the supplied analysis, not an official forecast. Exactly tripling an assumed base of 35–42 TWh instead yields 105–126 TWh. The baseline and demand-growth rounding are undisclosed; no GW target can be inferred without capacity factors, storage, losses and dispatch assumptions.

3. The grid: the most visible implementation constraint

The supplied analysis transcribes presentation slides showing 8,400 MW of registered nominal capacity and around 2,800 MW available on an unspecified date (33.3%). It also reports a separate estimate of roughly 3,000 MW in August 2026 and an investigative range of 1,600–2,500 MW. These are neither contemporaneous observations nor annual generation figures.

The analysis records eight of 23 400 kV lines out of service, or 34.8% by count, not length or transfer capability, and an outdated SCADA system with the end-of-support year cropped. It also reports combined technical and commercial losses of 45% in August 2025 and collection ratios of 60–70% from an incomplete slide. These require original-slide verification and are not confirmed current values for November 2026.

UNDP identifies more than 4,000 km of new transmission lines, restoration of 812 km and seven new substations to 2040 at an estimated USD 1.5 billion. The price year and detailed financing are undisclosed. New generation cannot translate into reliable supply without adequate connection, transmission, distribution, loss reduction and system control.

4. Off-grid solar: a large installed base outside central metering

IRENA’s Renewable Capacity Statistics 2026 confirms installed solar capacity increased from 33 MW in 2021 to 307 in 2022, 1,022 in 2023, 1,606 in 2024 and 2,249 MW in 2025. Off-grid solar reached 249, 931, 1,500 and 2,060 MW in 2022–2025 respectively. Off-grid accounted for 91.6% of solar in 2025 (2,060 ÷ 2,249), leaving approximately 189 MW grid-connected.

End-2025 renewable capacity mix: 2,060 MW off-grid solar; 189 MW grid-connected solar (calculated residual); 1,545 MW hydro; 5 MW wind; 7 MW bioenergy. Total: 3,806 MW. Off-grid solar alone accounted for 54.1%. IRENA’s year-specific series resolves the hydro discrepancy in the supplied analysis: 1,490 MW in 2024 and 1,545 in 2025.

The supplied analysis cites 862 GWh of recorded renewable generation in 2024, attributed to IRENA; the original generation table was not independently rechecked. Low recorded generation alone cannot establish unmetered output: operating conditions, water availability, capacity factors and statistical coverage all matter. A national distributed-energy register and generation measurements would improve planning, consistent with the announced national data platform.

5. Four hourly modelling cases: fuel, storage and reliability

The supplied description of the presentation identifies four cases that progressively introduce constraints:

  • 1A — Committed fleet, fuel as required: how much fuel is needed?
  • 1B — Committed fleet, fuel capped: what can operate under the constraint?
  • 2 — Master Plan case: with capped fuel, what additional storage is required to meet reliability?
  • 3 — High renewables: without imports and with a stricter reliability criterion, what investment is required?

Sensitivity tests cover take-or-pay hours for thermal plants, minimum synchronous units, demand, losses, load factor and population-related demand sensitivity, capital cost and gas price. The available material does not disclose storage power, energy capacity or cost. The 61.4% share remains conditional on operation, finance and flexibility.

6. Project agreements are not operational capacity

UCC — Following the 29 May 2025 memorandum, final concessions were signed on 6 November. Solar comprises 1,000 MW across Widian Al-Rabee (200), Deir ez-Zor (300), Aleppo (300) and Homs (200). The package also includes 4,000 MW gas-fired capacity. Contracts do not establish operation.

Saudi Al Harfi — Three agreements on 5 August 2026 cover three projects in Rural Damascus with 760 MW solar and 1,077 MWh storage, according to pv magazine and Enerdata. Some reports use MW for storage, a unit discrepancy. Completion and connection must be established before counting installed capacity.

ACWA Power — Joint development agreement to study around 1,000 MW solar and 1,500 MW wind, potential grid storage and a national training centre. It is not equivalent to a PPA or financial close.

We do not aggregate these capacities as a unique pipeline because potential site overlap, particularly at Widian Al-Rabee, requires verification. The available material does not establish the latest construction or operating status of each project.

7. Financing and bankability

Norton Rose Fulbright’s June 2026 guide estimates around USD 40 billion of investment to rebuild and modernise the electricity sector. The USD 1.5 billion transmission package is 3.75% of that estimate (1.5 ÷ 40 × 100). The estimates differ in scope and methodology; this comparison neither proves a 96.25% financing gap nor committed funding.

Japan and UNDP launched a USD 12.4 million project to maintain two Jandar units over 24 months, supporting delivery of up to 540 MW rather than adding new capacity. Norway announced at least NOK 400 million in support for Syria in March 2025; this was country-wide support, not the Master Plan budget. Its specific preparation funding was not established.

Investment risks include limited offtake guarantees, local-currency payment and exchange-rate exposure. Loss reduction, collections and purchaser creditworthiness are central to bankable PPAs.

8. What should be disclosed before the scenario becomes an implementation programme?

  • Definition, geographical distribution and technology split of the 57.4 GW potential.
  • Base year, annual and peak demand, hourly modelling and reliability criterion.
  • Technology-specific capacity milestones in 2030, 2035 and 2040, with implementation and connection phases.
  • Storage power in MW, energy in MWh, duration and cost.
  • Inventory of operational and damaged assets, including 66 kV, and grid-expansion priorities.
  • Loss, collection and metering data, with definitions, measurement periods, financing and guarantee arrangements.

Conclusion: the plan's strength is linking renewable expansion to fuel, demand and grid constraints. Success should not be measured by the 61.4% headline alone, but by transparent assumptions, grid rehabilitation, distributed-energy data and conversion of contracts into operational projects through identifiable milestones.

Methodology and sources

Review date: 27 November 2026. Confidence is high for published UNDP and IRENA figures with their status distinguished; medium for transcribed indicators lacking complete slides; and estimated for editorial calculations and illustrative ranges. Historical data are not live measurements. The article is based on the supplied analysis and cross-checked against the public sources below; it should be updated once the full plan is released.