Aleppo
A reference profile for Aleppo Governorate covering electricity generation, hydropower, renewable energy, industrial and service infrastructure, and rehabilitation indicators. Major assets include Aleppo Thermal Power Plant at a reference nominal capacity of 1,065 MW, with reported operating output of about 400 MW on 6 May 2026, and Tishreen Dam at 630 MW nominal hydropower capacity. The governorate is also seeing continued deployment of solar energy for water and irrigation services alongside extensive rehabilitation of transmission and distribution infrastructure.
Key indicators
18,500 km²
5,700,000
Power-generation stations
Aleppo Thermal Power Plant
Al-Safira
Methodological note
Workbook row: Conventional / Steam / Fuel and Gas; build year 1993. Capacity is treated as nominal/reference capacity. Current available and operational capacity are not verified.
Renewable-energy facilities
Reporting mode: Facility-level records
Tishreen Dam
Manbij area — Eastern Aleppo countryside
Daily electricity supply
Economic profile
Aleppo Governorate has a diversified economic base, with industry remaining one of its defining economic sectors, including textiles, food processing, engineering and chemical industries, concentrated particularly in Sheikh Najjar Industrial City and other industrial zones. Agriculture is also important across the governorate's rural areas, including wheat, barley, vegetables and irrigated crops. During 2026, industrial-zone rehabilitation and expansion continued alongside electricity and service infrastructure improvements intended to support production and investment recovery.
Regional profile
Profile scope
This profile covers Aleppo Governorate within its administrative boundary and distinguishes Aleppo city, the wider governorate, and national context. No capacity, project, or fuel volume is assigned to the governorate unless the source clearly identifies its location, status, and date.
Electricity and regional interconnection
Reuters reported on 4 May 2025 that Syria was working on electricity imports through a 400-kV line with Türkiye and on a gas pipeline from Kilis to Aleppo to supply power plants. These developments are recorded as announced regional interconnection plans, not as operational capacity or delivered supply until commissioning is documented.
Distributed energy and essential services
National evidence shows solar panels and batteries being used as coping solutions during weak grid supply, but no open and current Aleppo inventory was identified for system counts, capacity, or technical condition. The profile therefore prioritizes documenting systems in homes, industry, water, and health without converting qualitative observations into aggregate figures.
Rehabilitation and industrial loads
Assessment of the governorate must separate generation plants, substations, and transmission lines from local distribution conditions in neighbourhoods and industrial areas. Future records must include inspection date, owner, asset condition, and whether the asset is operational, offline, or under rehabilitation.
Data and action priorities
Priorities are a geospatial register of electricity assets and solar systems, verification of the Türkiye interconnection and announced gas pipeline, and documentation of industrial and public-service loads. These are research priorities, not confirmation that projects or new supplies have become operational.
Major generation assets and dams
The current reference baseline for Aleppo includes Aleppo Thermal Power Plant with a nominal capacity of 1,065 MW (workbook build year: 1993) and Tishreen Dam with a nominal hydropower capacity of 630 MW (1999). These are historical/nameplate reference values from the source workbook, not current available or operating capacity or actual generation in 2026.
General sources
Reuters · 4 May 2025 · High confidence
Source note
Supports the announced 400-kV interconnection and Kilis–Aleppo gas-pipeline context. It does not prove commissioning or governorate-level delivered energy.
Reuters · 25 Jun 2025 · High confidence
Source note
National electricity-recovery context only; no Aleppo-specific allocation or indicator is inferred.
Associated Press · 7 Jul 2025 · High confidence
Source note
National qualitative context for distributed solar and batteries. It is not used to estimate Aleppo system counts or capacity.
Syrian Renewables · 5 Sept 2026 · Medium confidence
Source note
Transcribed without changing the tabular values from the user-provided workbook. Capacities are treated as nominal/reference values; current operating status requires separate verification.