Hama
A reference profile for Hama Governorate covering power generation, the electricity grid, solar energy, water and agricultural infrastructure, and rehabilitation needs. Major existing assets include Al-Zara Thermal Power Plant at 660 MW nominal capacity and Mhardeh Thermal Power Plant at 660 MW nominal capacity, where a 100 MW generating unit was restarted on 20 March 2026. Reconstruction of the 1,000 MW Zayzoun project has also entered implementation, alongside the new 800 MW Mhardeh project, while a new 3 MW solar plant entered service in eastern rural Hama in April 2026.
Key indicators
8,883 km²
2,000,000
Power-generation stations
Al-Zara Power Plant
Al-Zara — Southern Hama countryside
Mhardeh Thermal Power Plant
Mhardeh
Renewable-energy facilities
Reporting mode: Facility-level records
Mahardah Hydro Plant
Methodological note
Workbook row: Hydro; build year 1979. Capacity is nominal/reference hydropower capacity; current generation is not verified.
Tayyibat Al-Turki Solar Power Plant
Tayyibat Al-Turki village — Eastern Hama countryside
Daily electricity supply
Economic profile
Hama's economy is strongly anchored in agriculture and food production, particularly cereals, irrigated farming in the Al-Ghab area, pistachios and livestock, alongside an important industrial and commercial base. The 2026 season recorded a substantial improvement in wheat procurement, while irrigation networks, dams and agricultural infrastructure are undergoing rehabilitation. Industrial recovery and expansion are also being pursued, including rehabilitation of Hama's steel plant and proposals for an industrial city, free zone and dry port.
Regional profile
Profile scope
The profile covers energy and service assets within Hama Governorate without mixing them with assets in Homs, Idlib, or the coast. Every future value must identify location, period, owner, and indicator type.
Electricity and the grid
Reuters reported in April 2025 that power was gradually restored to Hama after a nationwide failure, confirming exposure to national-grid constraints. The report does not provide local supply hours, available capacity, or losses and is not used to create a numerical indicator.
Solar energy and agricultural uses
The governorate needs separate documentation of household, agricultural, and water-pumping solar systems because uses, scales, and technical conditions differ. No penetration rate or capacity is assumed from national context alone.
Water, irrigation, and electricity assets
Substation, line, and distribution-network condition should be linked to irrigation, pumping, and public-service needs while separating electricity consumption from generator fuel requirements. Outages and maintenance must be documented over time.
Data and action priorities
Priorities are a geospatial asset database, an energy register for agriculture and water, standardized supply and reliability measurement, and energy-efficiency assessment for public and industrial facilities. All future values must retain a clear source, date, and unit.
Major generation and hydropower assets
The current Hama reference baseline includes Al-Zara Power Plant at 660 MW nominal capacity (2000), Mhardeh Thermal Power Plant at 660 MW nominal capacity (1979), and Mahardah Hydro Plant at 85 MW nominal capacity (1979). All figures are nominal/reference values, not measurements of current operation.
General sources
Reuters · 1 Apr 2025 · High confidence
Source note
Supports national grid-failure context and reported restoration in Hama. It does not provide a local operating series.
Reuters · 25 Jun 2025 · High confidence
Source note
National electricity-recovery context only; no Hama-specific allocation is inferred.
Associated Press · 7 Jul 2025 · High confidence
Source note
National qualitative context for distributed solar and batteries. It is not evidence of a Hama total.
Syrian Renewables · 5 Sept 2026 · Medium confidence
Source note
Transcribed without changing the tabular values from the user-provided workbook. Capacities are treated as nominal/reference values; current operating status requires separate verification.