Latakia
A reference profile for Latakia Governorate covering electricity generation and grid infrastructure, Latakia Port, water and agricultural infrastructure, distributed energy, tourism and coastal environmental risks. The generation baseline includes the Al-Rasteen project with a reference design capacity of 526 MW, while current operating capacity still requires additional official verification. During 2026, electricity and water infrastructure rehabilitation continued across several areas, Latakia Port recorded significant commercial activity, and irrigation and wildfire-response systems were strengthened.
Key indicators
2,297 km²
1,600,000
Power-generation stations
Al-Rasteen
Al-Rasteen
Methodological note
Workbook row: Conventional / Combined-cycle turbines / Gas; build year 2026. Capacity is nominal/reference only; the workbook does not establish current available or operational capacity.
Daily electricity supply
Economic profile
Latakia Governorate has a diversified economic base combining maritime transport and logistics, trade, agriculture, tourism and services, alongside industrial activities linked to the local market and port. Latakia Port is one of the governorate's most important economic assets and a major gateway for Syrian trade, while agriculture and rural production remain significant across Jableh, Qardaha, Al-Haffah and other areas. Coastal and mountain tourism also contributes to the local economy. During 2026, port development, agricultural and water-infrastructure rehabilitation, tourism and local investment activity continued.
Regional profile
Profile scope
The profile covers Latakia Governorate and separates its data from Tartus Governorate, especially Baniyas port, refinery, and power assets outside Latakia. No coastal project is assigned to the governorate without an explicit administrative location.
Electricity and the grid
The governorate is affected by national generation, fuel, and grid constraints, but the sources used do not provide an independent measure of supply hours, loads, or losses in Latakia. Numerical indicators therefore remain unavailable.
Distributed energy and efficiency
Verification should cover solar and battery systems in homes, hotels, public facilities, and agriculture, along with efficiency in cooling and pumping. Governorate totals are not derived from national trends or scattered observations without a documented inventory.
Coastal environment and risks
The profile requires tracking fuel and oil spills, emissions from generators and transport, and impacts of storage and coastal services, distinguishing incidents in Latakia from those on the Tartus coast. Every incident must have a source, location, and date.
Data and action priorities
Priorities are an inventory of coastal networks and loads, documentation of solar and energy efficiency in services and tourism, and an environmental register for energy, transport, and storage. Every asset should be linked to owner, operator, and condition.
Major generation assets
The current Latakia reference baseline includes Al-Rasteen with a nominal capacity of 526 MW and a workbook build year of 2026. The value is presented as nominal/reference capacity and does not imply current available capacity or actual operation.
General sources
Reuters · 25 Jun 2025 · High confidence
Source note
National electricity-recovery context; no Latakia-specific investment or indicator is inferred.
Associated Press · 7 Jul 2025 · High confidence
Source note
National distributed-energy context only.
Reuters · 18 Jul 2025 · High confidence
Source note
National energy-planning context west of the Euphrates. It does not identify a funded Latakia project.
Syrian Renewables · 5 Sept 2026 · Medium confidence
Source note
Transcribed without changing the tabular values from the user-provided workbook. Capacities are treated as nominal/reference values; current operating status requires separate verification.