Governorate profile

Tartus

A reference profile for Tartus Governorate focused on electricity, Baniyas refinery and port, petroleum transport and storage, energy for coastal services, and environmental risks. The current baseline includes Baniyas Thermal Power Plant and its expansion. Listed capacities are nominal/reference capacities, not current operating capacity.

Documented power plants2Facility records
Conventional assets

Power-generation stations

Steam turbine / fuel oil

Banias Thermal Power Plant

Banias

Unknown
Nominal capacity670 MW
Reference date5 Sept 2026
Data qualityMedium confidence
Source date5 Sept 2026
Syrian Renewables — Power plant in Syria.xlsx reference dataset
Methodological note

Workbook row: Conventional / Steam / Oil (Steam); build year 1987. Capacity is nominal/reference only.

Gas turbine

Banias Expansion

Banias

Unknown
Nominal capacity270 MW
Reference date5 Sept 2026
Data qualityMedium confidence
Source date5 Sept 2026
Syrian Renewables — Power plant in Syria.xlsx reference dataset
Methodological note

Workbook row: Conventional / Gas / Gas, 270 MW; build year is blank. Capacity is nominal/reference only.

Context and analysis

Regional profile

Profile scope

The profile covers Tartus Governorate including Baniyas and separates it from facilities in Latakia Governorate. Commercial port operations, petroleum infrastructure, the naval base, and proposed or disputed projects must be distinguished.

Electricity and the grid

Reuters reported in April 2025 that electricity was progressively restored in Tartus following a nationwide failure. This does not establish supply hours, available capacity, or each plant's condition and is not converted into a local indicator.

Baniyas, refining, and petroleum transport

Reporting in 2026 shows Baniyas as important for storage, maritime handling, and regional transit of petroleum products, while describing changing arrangements and infrastructure under development. Port and storage activity must be separated from refinery operation, and transit flows are not local production or refining.

Coastal environmental risks

The register should cover spills and incidents during unloading, transport, storage, and refining, identifying location, quantity, material, and response. Separate events are not aggregated into an annual figure without a consistent method.

Data and action priorities

Priorities are separate databases for the port, refinery, power station, tanks, and pipelines; documentation of operating status, flows, and ownership; and an environmental and logistics-energy register. Proposed or officially denied projects must be clearly labelled.

Major generation assets

The current Tartus reference baseline includes Baniyas Thermal Power Plant at 670 MW nominal capacity (1987) and the Baniyas Expansion at 270 MW nominal capacity, with no build year provided in the workbook. These are nominal/reference values and do not represent current operating capacity.

Data transparency

General sources

Power plant in Syria.xlsx — imported reference dataset

Syrian Renewables · 5 Sept 2026 · Medium confidence

Source note

Transcribed without changing the tabular values from the user-provided workbook. Capacities are treated as nominal/reference values; current operating status requires separate verification.